As of now, if the capacity is below 1MW, and the industry owns the plant, the electricity is produced for self-consumption of the industrial facility, then no licenses are required. If the capacity is above 1MW, you will need to acquire a permit. If it is above 3MW, you would need a license. The process of getting a license is a bit time-consuming, but not expensive.